Scheduler: FACSAria II (BSL-2) (405/488/561/640) MCRB 695

Contact UFCR flowsort@umn.edu or 4-7680.

UFCR Billboard: Please check your SPAM folder for reservation confirmations. Look here for important notices regarding this instrument

 

Day
Week
Month
Year

List
Grid
Planner
Report

perm:
  VIEW

   Previous   Today   Next      Default View   Add to Favorites  Print  Help
    Collapse
Date/Time  Sorted By Duration  Sort Event Info  Sort Aseptic  Sort Nozzle Change  Sort Plates  Sort Nozzle Size  Sort Notes  Sort Customer Name  Sort Customer Email  Sort Customer Phone  Sort Owner  Sort
Jun 12, 10a-5p 7h Blazar-Fathima; 85um aseptic (BV421, PE,FITC, PE-Cy7,APCeF780) Yes Yes No 85 Please drop the samples and single stained controls at 11AM. corestaff
Jun 13, 10a-5p 7h Blazar-Fathima; 85um aseptic (BV421, PE,FITC, PE-Cy7,APCeF780) Yes Yes No 85 Please drop the samples and single stained controls at 11AM. corestaff
Jun 14, 10a-5p 7h Blazar-Fathima; 85um aseptic (BV421, PE,FITC, PE-Cy7,APCeF780) Yes Yes No 85 Please drop the samples and single stained controls at 11AM. corestaff
Jun 15, 9a-11:20a 2h 20m Cichocki-Alex; 100um aseptic (mRuby2) Yes Yes No 100 Please bring the samples and controls at 11 AM. corestaff
Jun 15, 1p-3p 2h Dong-Hannim; 100um plate (DAPI, AF488) No Yes Yes 100 Please drop the samples and single stained controls at 1:30PM. corestaff
Jun 15, 3p-6p 3h Zhu-Shan; aseptic 100um Plate(GFP) Yes Yes No 100 Please drop the samples and controls at 4PM. corestaff
Jun 16, 10a-1p 3h Blazar-Suji; 85um aseptic (PE, BV421, BV711, APC-ef780) Yes Yes No 85 Please drop the samples and single stained controls at 10AM. corestaff
Jun 16, 1p-2p 1h Zhu-Shan; aseptic 100um Plate(GFP) No Yes No 70 Please drop the samples and controls at 1PM. corestaff
Jun 16, 2p-4p 2h Hackel-Sarah ; 70um ( FITC, DL650) No Yes No 70 Please drop the samples and single stained controls at 2:30PM. corestaff

Powered by Calendars for the Web©
Calendar
Search
About

Login