Scheduler: FACSAria II (BSL-2) (405/488/561/640) MCRB 695

Contact UFCR flowsort@umn.edu or 4-7680.

UFCR Billboard: Please check your SPAM folder for reservation confirmations. Look here for important notices regarding this instrument

 

  April 2024  
   
Date/Time Duration Event Info Aseptic Nozzle Change Plates Nozzle Size Notes Customer Name Customer Email Customer Phone Owner
Apr 1, 10a-5p 7h Blazar-Yiyun; 85um aseptic (BV711 PE,FITC, eF780,) Yes Yes No 85 Please drop the samples and single stained controls at 11AM. corestaff
Apr 2, 10a-1p 3h No Sorting Available Yes Yes No 70 corestaff
Apr 3, 1p-3p 2h Dong-Hannim; 100um (DAPI, AF488) No No No 100 Please drop the samples and single stained controls at 1:30PM. corestaff
Apr 3, 3p-4:30p 1h 30m Hackel-Sarah ; 70um ( PE) Yes Yes No 70 Please drop the samples and single stained controls at 3:30PM. corestaff
Apr 4, 10a-5p 7h BD Service PM; No sorting; check CCRB and MRF for availability Yes Yes No 70 corestaff
Apr 5, 9:30a-4:30p 7h Blazar-Cameron; 85um aseptic (BV711 PE,FITC, eF780,) Yes Yes No 85 Please drop the samples and single stained controls at 10:30AM. corestaff
Apr 8, 10a-4p 6h Blazar-Pooja Shree (85um; aseptic; FITC, PE, APCef780, BV711) Yes No No 85 Sort begins at 11am. Please bring single and unstained controls corestaff
Apr 9, 12p-5p 5h Blazar-Suji; 85um aseptic (BV421, APC-ef780, PE, GFP) Yes Yes No 85 Please drop the samples and single stained controls at 1PM. corestaff
Apr 10, 12p-5p 5h Blazar_Suji; 85um aseptic (BV421, GFP, PE, APC-eF780) Yes Yes No 85 Please arrive at 1 PM for your sort. Please bring single stained controls. corestaff
Apr 11, 10a-5p 7h Blazar-Suji; 85um aseptic (BV421, BV711, BV785, APC-ef780, PE, APC) Yes Yes No 85 Please drop the samples and single stained controls at 11AM. corestaff
Apr 12, 10:30a-5p 6h 30m Blazar-Yiyun; 85um aseptic (BV711 PE,FITC, eF780) Yes Yes No 85 Please drop the samples and single stained controls at 11:30AM. corestaff
Apr 15, 10a-4:30p 6h 30m Blazar-Cameron; 85um aseptic (BV711 PE,FITC, eF780,) Yes Yes No 85 Please drop the samples and single stained controls at 11AM. corestaff
Apr 16, 10a-5p 7h Hippen/Margaret (85um; aseptic; APC, PerCPCy5.5, EF605, PE, BV421) Yes No No 85 Sort begins at 10am. Please bring single stained and unstained controls corestaff
Apr 18, 1p-5p 4h Dehm-Yingming; 130um aseptic (APC, PE) Yes Yes No 130 Please drop the samples and single stained controls at 2PM. corestaff
Apr 19, 1p-3p 2h Dong - Hannim 100um (plate; af488/DAPI) No Yes Yes 100 Please arrive at 1:30 PM corestaff
Apr 22, 9a-12p 3h SachsJ - 100um aseptic (GFP/mScarlet) Yes Yes No 100 Please arrive at 10:00 AM corestaff
Apr 24, 1p-3p 2h Dong-Hannim; 100um (plate; DAPI, AF488) No No Yes 100 Please drop the samples and single stained controls at 1:30PM. corestaff
Apr 26, 10:30a-5p 6h 30m Blazar-Yiyun (86um; aseptic; BV711, FITC, PE, APC-eF780) Yes No No 85 Sort begins at 11:30, please bring single and unstained controls corestaff
Apr 29, 10a-5p 7h no sorting Yes Yes No 70 corestaff
Apr 30, 11:30a-4p 4h 30m Song-Bo (100um; tdTomato, aF488) No Yes No 100 Sort begins at 12:00pm, please bring single and unstained controls corestaff