Scheduler: FACSAria II (BSL-2) (405/488/561/640) MCRB 695

Contact UFCR flowsort@umn.edu or 4-7680.

UFCR Billboard: Please check your SPAM folder for reservation confirmations. Look here for important notices regarding this instrument

 

  May 2023  
   
Date/Time Duration Event Info Aseptic Nozzle Change Plates Nozzle Size Notes Customer Name Customer Email Customer Phone Owner
May 1, 12p-5p 5h Blazar-Mehrdad; 85um aseptic (BV421,BV711, GFP, APC-ef780, PE) Yes Yes No 85 Please drop the samples and single stained controls at 1PM. corestaff
May 2, 12p-4p 4h Sachs-Klara; 70um aseptic (EF450, APC,FITC, AF700) Yes Yes No 70 Please drop the samples and single stained controls at 1PM. corestaff
May 3, 9a-4p 7h Cichocki-Bin, 70um (BV605, BV786,PE-Cy7) Yes Yes No 70 Sort stars at 10AM. Please bring single stained controls. corestaff
May 4, 11a-2p 3h Zhu-Shan; aseptic 100um Plate(GFP) Yes Yes No 70 Please drop the samples and single stained controls at 12PM. corestaff
May 8, 2p until May 10, 5p 2d 3h BD engineer Yes Yes No 70 corestaff
May 11, 9a-11a 2h No sorting Yes Yes No 70 x corestaff
May 12, 12:40p-5p 4h 20m Blazar-Mehrdad; 85um aseptic (BV421, FITC, APC-ef780, PE) Yes Yes No 85 Please drop the samples and single stained controls at 2PM. corestaff
May 15, 2:30p-4p 1h 30m Venteicher-Cameron 100um (BFP, L/DeF780) No Yes No 100 Please drop the samples and single stained controls at 3PM. corestaff
May 16, 2:30p-4p 1h 30m Hackel-Gregory; 70um (FITC, Alexa Fluor 647) Yes Yes No 70 Please drop the samples and single stained controls at 3PM. corestaff
May 19, 10:30a-1p 2h 30m Modiano-Lauren; 85um (SB436 , PE, FITC , APC, Viability Dye 780) Yes Yes No 85 Please drop the samples and single stained controls at 11AM. corestaff
May 26, 9a-11:30a 2h 30m Blazar-Suji; 85um aseptic (BV711, APC-ef780, RFP, GFP) Yes Yes No 85 Please drop the samples and single stained controls at 10AM. corestaff
May 29, 10a-5p 7h No sorting- University Holiday Yes Yes No 70 corestaff
May 30, 12p-3p 3h Blazar-Suji; 85um aseptic ( BV421, PE, PE-cy7, APC-ef780) Yes Yes No 85 Please drop the samples and single stained controls at 1PM corestaff
May 30, 3p-5p 2h Zhu-Shan; aseptic 100um Plate(GFP) Yes Yes No 100 Please drop the samples and controls at 3PM. corestaff
May 31, 9a until Jun 1, 5p 1d 8h No Sorting-Out of Service Yes Yes No 70 corestaff