Scheduler: FACSAria II (BSL-2) (405/488/561/640) MCRB 695

Contact UFCR flowsort@umn.edu or 4-7680.

UFCR Billboard: Please check your SPAM folder for reservation confirmations. Look here for important notices regarding this instrument

 

  September 2022  
   
Date/Time Duration Event Info Aseptic Nozzle Change Plates Nozzle Size Notes Customer Name Customer Email Customer Phone Owner
Sep 1, 10a-5p 7h No sorting Yes Yes No 70 corestaff
Sep 2, 11a-1:30p 2h 30m Sachs-Marie; 100um aseptic (GFP, EF450 viability, CD123 APC EF780, CD69 BV786) Yes Yes No 100 Please drop the samples and single stained controls at 12PM. corestaff
Sep 2, 2p-5p 3h Blazar-Mehrdad; 85um aseptic (GFP, APC, L/Daqua) Yes Yes No 85 Please drop the samples and single stained controls at 3PM. corestaff
Sep 5, 10a-5p 7h No Sorting-University Holiday Yes Yes No 70 corestaff
Sep 6, 9a-12p 3h Largaespada-Garrett; 100um aseptic (GFP, zombie violet) Yes Yes No 100 Please drop the samples and single stained controls at 10AM. corestaff
Sep 6, 12p-5p 5h Blazar-Mehrdad; aseptic 100um (APCeF780, GFP,PE) Yes Yes No 100 Please drop the samples and single stained controls at 1PM. corestaff
Sep 7, 9:30a-4:30p 7h Hippen-Sarah; 85um aseptic (CD4 - APC, CD8 - APC, CD25 - BV605, CD38 - PerCPcy5.5, CD45RA - BV421, CD127 - PE) Yes Yes No 85 Sort started at 10:30AM. corestaff
Sep 8, 11a-1:30p 2h 30m Sachs-Marie; 100um aseptic (GFP, viability EF450, CD123 APC-EF780, CD69 BV786) Yes Yes No 100 Sort starts at 12PM. Please bring single stain controls and unstained control. corestaff
Sep 8, 1:30p-5:30p 4h Sloan-Matt; 85um aseptic (AF488,APC Fire 750,PacBlue ,AF647 L/D-Aqua) Yes Yes No 85 Please drop the samples and single stained controls at 2PM. 09/08: sort started at 2:30PM. corestaff
Sep 9, 10a-11a 1h No sorting-Check CCRB and MRF Yes Yes No 70 corestaff
Sep 9, 11a-4:30p 5h 30m Drake-Zoi; 130um (Viability-PI or Aqua blue) No Yes No 130 Please drop the samples and single stained controls at 11:30AM. corestaff
Sep 12, 10a-5p 7h No sorting; BD PM service; check CCRB and MRF for availability Yes Yes No 70 corestaff
Sep 13, 11:30a-3p 3h 30m Zarkower-Micah; 100um (GFP, Sytox red) No Yes No 100 Please drop the samples and single stained controls at 12PM. corestaff
Sep 14, 9:30a-2:30p 5h Saydam- Elisabet; 100um aseptic (GFP) Yes Yes No 100 Sort started at 10:30AM. corestaff
Sep 15, 11a-3p 4h Sachs-Marie;100um aseptic ( Hu Lin AF700, GFP, EF-450 viability, CD123 APCEF780) Yes Yes No 100 Please drop the samples and single stained controls at 12PM. corestaff
Sep 16, 1p-5p 4h No sorting; check CCRB and MRF for availability Yes Yes No 70 corestaff
Sep 22, 9:30a-11:20a 1h 50m Marcotte-AJ 100um (Scatter) No Yes No 100 Please drop the samples and single stained controls at 10AM. corestaff
Sep 22, 11:30a-1:30p 2h No sorting Yes Yes No 70 corestaff
Sep 26, 12p-5p 5h No sorting check MRF for availability Yes Yes No 70 x corestaff
Sep 27, 9a-3p 6h Saydam-Elisabet; 100um aseptic (GFP) Yes Yes No 100 Please drop the samples and negative controls at 10AM corestaff
Sep 28, 9a-5p 8h Hippen-Sarah; 85um aseptic (BV421, BV605, PE, PerCP-Cy5.5, APC) Yes Yes No 85 Please drop the samples and single stained controls at 10AM. corestaff
Sep 29, 1p-5p 4h Blazar-Jemma; 85um aseptic (BV421, APC-ef780, PE, GFP) Yes Yes No 85 Please drop the samples and single stained controls at 2PM. corestaff
Sep 30, 12p-3p 3h Blazar-Suji; 85um aseptic (BV421, APC-ef780, PE, GFP) Yes Yes No 85 Sort started at 1PM. corestaff