Scheduler: FACSAria II (BSL-2) (405/488/561/640) MCRB 695

Contact UFCR flowsort@umn.edu or 4-7680.

UFCR Billboard: Please check your SPAM folder for reservation confirmations. Look here for important notices regarding this instrument

 

Day
Week
Month
Year

List
Grid
Planner
Report

perm:
  VIEW

   Previous   Today   Next      Default View   Add to Favorites  Print  Help
    Collapse
Date/Time  Sorted By Duration  Sort Event Info  Sort Aseptic  Sort Nozzle Change  Sort Plates  Sort Nozzle Size  Sort Notes  Sort Customer Name  Sort Customer Email  Sort Customer Phone  Sort Owner  Sort
May 1, 9:30a-5:30p 8h Blazar-Cameron; 85um aseptic (BV711 PE,FITC, eF780,) Yes Yes No 85 Please drop the samples and single stained controls at 10:30AM. corestaff
May 2, 9:30a-4:30p 7h Blazar-Cameron; 85um aseptic (BV711 PE,FITC, eF780,) Yes Yes No 85 Please drop the samples and single stained controls at 10:30AM. corestaff
May 6, 9a-12:30p 3h 30m Sachs-Klara (70um; aseptic; GFP, eF450) Yes Yes No 70 Sort begins at 10am. Please bring a WT control. corestaff
May 7, 10a-5p 7h Hippen/Magda (85um; aseptic; APC, PerCPCy5.5, BV605, PE, BV421) Yes No No 85 Sort begins at 10am. Please bring single stained and unstained controls corestaff
May 8, 9:30a-4p 6h 30m Hu-Yu Chieh; 100um aseptic; (mCardinal) Yes No No 100 Please drop the samples and single stained controls at 10:30AM. corestaff
May 9, 9:30a-5p 7h 30m Revelo-Gavin; 100um ( AF700,PerC/Cy5.5, BV785,BV650,FITC,SB436, L/D-NIR Yes Yes No 100 Please drop the samples and single stained controls at 10AM. corestaff
May 10, 10a-5p 7h Blazar-Yiyun (85um; aseptic; BV711, FITC, PE, APC-eF780) Yes No No 85 Sort begins at 11am. corestaff
May 14, 10:30a-12:30p 2h Wang-Likang, 100um aseptic (GFP) Yes Yes No 100 Please drop the samples and single stained controls at 11:30AM. corestaff
May 14, 12:30p-5p 4h 30m No Sorting Yes Yes No 70 corestaff
May 15, 12p-2p 2h Czyzyk-Yury; 85um (FITC) No Yes No 85 Please drop the samples and controls at 12:30PM. corestaff
May 16, 1p-3:15p 2h 15m Dong-Hannim; 100um (DAPI, AF488) No No Yes 100 Please drop the samples and controls at 1:30PM. corestaff
May 17, 10a-4:30p 6h 30m Blazar-Mehrdad; 85um aseptic (BV711, FITC, APC-ef780, PE) Yes Yes No 85 Please drop the samples and single stained controls at 11:00AM. corestaff
May 20, 9:30a-2:30p 5h Lund-Kai; aseptic 100um (AF700, PE, APCeF780, Zombie violet)) Yes Yes No 100 Please drop the samples and single stained controls at 10AM. corestaff
May 22, 11:30a-1:30p 2h no sorting Yes Yes No 70 x corestaff
May 23, 12p-5p 5h Blazar-Suji; 85um aseptic (BV421, APC-ef780, PE, GFP/RFP) Yes Yes No 85 Please drop the samples and single stained controls at 1PM. corestaff
May 27, 10a-5p 7h No Sorting - University Holiday Yes Yes No 70 corestaff
May 29, 9a-5p 8h Hippen-Magda; 85um aseptic (BV421, BV605, PE, PerCP-Cy5.5, APC) Yes Yes No 85 Please drop the samples and single stained controls at 10AM. corestaff
May 30, 9a-5p 8h Blazar-Suji; 85um aseptic (BV421, BV711, BV785, APC, APC-ef780, PE) Yes Yes No 85 Please drop the samples and single stained controls at 10AM. corestaff

Powered by Calendars for the Web©
Calendar
Search
About

Login