Scheduler: FACSAria II (BSL-2) (405/488/561/640) MCRB 695

Contact UFCR flowsort@umn.edu or 4-7680.

UFCR Billboard: Please check your SPAM folder for reservation confirmations. Look here for important notices regarding this instrument

 

Day
Week
Month
Year

List
Grid
Planner
Report

perm:
  VIEW

   Previous   Today   Next      Default View   Add to Favorites  Print  Help
    Collapse
Date/Time  Sorted By Duration  Sort Event Info  Sort Aseptic  Sort Nozzle Change  Sort Plates  Sort Nozzle Size  Sort Notes  Sort Customer Name  Sort Customer Email  Sort Customer Phone  Sort Owner  Sort
Sep 1, 10a-5p 7h No sorting. Please check MRF or CCRB for availability Yes Yes No 70 x corestaff
Sep 4, 10a-5p 7h No sorting-University holiday Yes Yes No 70 corestaff
Sep 8, 9:30a-12p 2h 30m Gordon-Adam; 70um (FITC, AF647) No Yes No 70 Please drop the samples and single stained controls at 10AM. corestaff
Sep 8, 3p-5p 2h Hackel-Gregory; 70um (FITC) No Yes No 70 Please drop the samples and controls at 3:30PM. corestaff
Sep 12, 9:30a-5p 7h 30m Camell/Anna (100um; APC, BV711, PE, Sytox Blue) No Yes No 100 Sort begins at 10am. Please bring single stained and unstained controls. corestaff
Sep 13, 9a-5p 8h Hippen-Margaret; 85um aseptic (BV421, BV605, PE, PerCP-Cy5.5, APC) Yes Yes No 85 Please drop the samples and single stained controls at 10AM. corestaff
Sep 14, 9a-12p 3h Largaespada-Garrett; 100um aseptic (GFP, zombie violet) Yes Yes No 100 Please drop the samples and single stained controls at 10AM. corestaff
Sep 14, 12p-5p 5h Blazar-Mehrdad; 85um aseptic (BV421, PE, APC, APC-ef780) Yes Yes No 85 Please drop the samples and single stained controls at 1PM. corestaff
Sep 15, 9a-12:45p 3h 45m Blazar-Suji; 85um aseptic ( BV711, ef780, GFP, PE) Yes Yes No 85 Please drop the samples and single stained controls at 10AM. corestaff
Sep 15, 2:15p-5p 2h 45m Hackel-Gregory; 70um (GFP) No Yes No 70 Please drop the samples and controls at 2:45PM. corestaff
Sep 18, 12p-5p 5h Blazar-Cameron; 85um aseptic (BV421, PE, FITC, APC-ef780,) Yes Yes No 85 Please drop the samples and single stained controls at 1PM. corestaff
Sep 19, 12p-4p 4h Sachs-Klara; 70um aseptic (EF450, APC,FITC, AF700) Yes Yes No 70 Please drop the samples and single stained controls at 1PM. corestaff
Sep 20, 9a-5p 8h Hippen-Kyle; 85um aseptic (BV421, BV605, PE, PerCP-Cy5.5, APC) Yes Yes No 85 Please drop the samples and single stained controls at 10AM. corestaff
Sep 21, 10a-5p 7h Blazer/Eun (85um; aseptic; APC, FITC, PECy7, APC-Cy7_ Yes Yes No 85 Sort begins at 12pm. Please bring unstained and single stained controls and FMOs. corestaff
Sep 26, 1:30p-3:15p 1h 45m Venteicher-Cameron 100um (BFP, L/DeF780) No Yes No 100 Please drop the samples and single stained controls at 10AM. corestaff
Sep 27, 10a-4:30p 6h 30m Cichocki-Bin; 70um aseptic (PE-cy7 BV605) Yes Yes No 70 Please drop the samples and single stained controls at 11AM. corestaff
Sep 28, 9:30a-11:30a 2h Hackel-Paul 70um (FITC, AF647) No Yes No 70 Please drop the samples and single stained controls at 10AM. corestaff
Sep 28, 12p-5p 5h Blazar-Cameron; 85um aseptic (BV421, PE, FITC, FVDef780,) Yes Yes No 85 Please drop the samples and single stained controls at 12PM. corestaff
Sep 29, 10a-3:45p 5h 45m Blazar-Jemma; 85um aseptic (BV711, APC-ef780, RFP, GFP) Yes Yes No 85 Please drop the samples and single stained controls at 11AM. corestaff

Powered by Calendars for the Web©
Calendar
Search
About

Login