Scheduler: FACSAria II (BSL-2) (405/488/561/640) MCRB 695

Contact UFCR flowsort@umn.edu or 4-7680.

UFCR Billboard: Please check your SPAM folder for reservation confirmations. Look here for important notices regarding this instrument

 

  May 2024  
   
Date/Time Duration Event Info Aseptic Nozzle Change Plates Nozzle Size Notes Customer Name Customer Email Customer Phone Owner
May 1, 9:30a-5:30p 8h Blazar-Cameron; 85um aseptic (BV711 PE,FITC, eF780,) Yes Yes No 85 Please drop the samples and single stained controls at 10:30AM. corestaff
May 2, 9:30a-4:30p 7h Blazar-Cameron; 85um aseptic (BV711 PE,FITC, eF780,) Yes Yes No 85 Please drop the samples and single stained controls at 10:30AM. corestaff
May 6, 9a-12:30p 3h 30m Sachs-Klara (70um; aseptic; GFP, eF450) Yes Yes No 70 Sort begins at 10am. Please bring a WT control. corestaff
May 7, 10a-5p 7h Hippen/Magda (85um; aseptic; APC, PerCPCy5.5, BV605, PE, BV421) Yes No No 85 Sort begins at 10am. Please bring single stained and unstained controls corestaff
May 8, 9:30a-4p 6h 30m Hu-Yu Chieh; 100um aseptic; (mCardinal) Yes No No 100 Please drop the samples and single stained controls at 10:30AM. corestaff
May 9, 9:30a-5p 7h 30m Revelo-Gavin; 100um ( AF700,PerC/Cy5.5, BV785,BV650,FITC,SB436, L/D-NIR Yes Yes No 100 Please drop the samples and single stained controls at 10AM. corestaff
May 10, 10a-5p 7h Blazar-Yiyun (85um; aseptic; BV711, FITC, PE, APC-eF780) Yes No No 85 Sort begins at 11am. corestaff
May 14, 10:30a-12:30p 2h Wang-Likang, 100um aseptic (GFP) Yes Yes No 100 Please drop the samples and single stained controls at 11:30AM. corestaff
May 14, 12:30p-5p 4h 30m No Sorting Yes Yes No 70 corestaff
May 15, 12p-2p 2h Czyzyk-Yury; 85um (FITC) No Yes No 85 Please drop the samples and controls at 12:30PM. corestaff
May 16, 1p-3:15p 2h 15m Dong-Hannim; 100um (DAPI, AF488) No No Yes 100 Please drop the samples and controls at 1:30PM. corestaff
May 17, 10a-4:30p 6h 30m Blazar-Mehrdad; 85um aseptic (BV711, FITC, APC-ef780, PE) Yes Yes No 85 Please drop the samples and single stained controls at 11:00AM. corestaff
May 20, 9:30a-2:30p 5h Lund-Kai; aseptic 100um (AF700, PE, APCeF780, Zombie violet)) Yes Yes No 100 Please drop the samples and single stained controls at 10AM. corestaff
May 21, 10a-5p 7h No sorting Engineer visit Yes Yes No 70 corestaff
May 22, 10a-5p 7h no sorting Yes Yes No 70 x corestaff
May 23, 12p-5p 5h Blazar-Suji; 85um aseptic (BV421, APC-ef780, PE, GFP/RFP) Yes Yes No 85 Please drop the samples and single stained controls at 1PM. corestaff
May 27, 10a-5p 7h No Sorting - University Holiday Yes Yes No 70 corestaff
May 28, 9:30a-12p 2h 30m Cichocki-Bin; 85um (eGFP) No Yes No 85 Please drop the samples and controls at 10AM. corestaff
May 29, 9a-5p 8h Hippen-Magda; 85um aseptic (BV421, BV605, PE, PerCP-Cy5.5, APC) Yes Yes No 85 Please drop the samples and single stained controls at 10AM. corestaff
May 30, 9a-5p 8h Blazar-Suji; 85um aseptic (BV421, BV711, BV785, APC, APC-ef780, PE) Yes Yes No 85 Please drop the samples and single stained controls at 10AM. corestaff
May 31, 1p-2:30p 1h 30m Dong-Hannim; 100um (DAPI, AF488) No Yes Yes 100 Please drop the samples and single stained controls at 1:30PM. corestaff